The following list shows a partial list of our more significant projects representing our experience in the following project categories:


Harman International Business Campus, Northridge

160,000 SF office building, tilt-up construction.


Sherman Oaks Office Tower, Sherman Oaks.

A 17-story steel-framed office building with underground parking.


Carmenita Commerce Center, Santa Fe Springs

300,000 SF office/light-industrial/park.  Use of Tilt tilt-up construction and panelized roof system.


Commerce Business Park, Building No. 118, City of Commerce.

Four-story office building, 80,000 SF of  Type I construction.


26th & Wilshire Building,  Santa Monica

Three-story office building with four level underground parking.


Cypress Pointe, City of Cypress

175,000 SF office building complex.


Conejo Spectrum, Thousand Oaks

New light-industrial buildings (140,000 SF). Construction consisted of panelized roof and tilt-up perimeter walls.  Steel columns and diagonal seismic braces was used for the interior supports. Project included seismic retrofit and renovations of existing tilt-up buildings (400,000 SF).


Haven Pointe Office Building, Rancho Cucamonga

A 30,000-SF three-story steel-framed office building.  Steel moment resistant connections.


Three Major Stores,  Arizona.

Two-story steel-framed Department Stores. Composite floor deck; steel diagonal bracing used to resist seismic loads.  Each store is roughly 100,000-sf.


Lincoln Distribution Center, La Habra California.

120,000 SF Warehouse, Retail and Light-Industrial complex of tilt-up/panelized roof construction.


Riverside Business Center, Riverside.

Retail, Office and Light-Industrial Buildings. Project included tilt-up/panelized roof and conventional wood-framed retail structures.


Ontario Mall, Ontario California.

New multi-tenant 25,000 SF retail structure of wood framed construction


Imperial Bank, Sherman Oaks, California.

Fifteen story office tower.  Structural steel moment frame