The following list shows a partial list of our more significant projects representing our experience in the following project categories:


North Hollywood High School Modernization-LAUSD

Large project including over 110,000-sf of new classroom, gymnasium, auditorium buildings and seismic retrofit of three existing building structures.


Ocean Charter School New K-8 Campus, LAUSD

New elementary school building including classrooms, multi-purpose/gymnasium, administration and underground parking structure.


Monsenor Oscar Romero Charter School, YPICS

New elementary school building including classrooms, multi-purpose/gymnasium, administration and underground parking structure.


ACES Charter Elementary School-Los Angeles, California

New Elementary Charter School. Project consists of classroom, administrative, multipurpose/cafeteria building, over an underground parking structure.


Marshall High School Gym, PUSD

A new sports complex including gymnasium, lockers, and classrooms.


Idyllwild Arts Academy Performing Arts Center

Concert Hall with 300 seats at Idyllwild Arts Academy. All steel frame


Valley High School No. 5-LAUSD

A new High School for approximately 2,160 students. The project features four 3 story classroom communities each constructed of structural steel framing with SCBF frames to resist seismic loads. Other buildings included Multi-Purpose, Gymnasium and Library.


Juan Soria Elementary School-OXNARD USD

The project consists of a new steel-framed elementary school adjacent an airport facility with barrel vaulted roofs.


Central Region #13 Elementary School-LAUSD

A new primary school facility consisting of two-story classroom and Multi Purpose buildings over an underground parking structure.


Rio Hondo College – Technology Center

Seismic upgrade to current code, three building structures.


Extension Center and Alumni House UC Irvine, Irvine California.

A 10,000 SF facility with classrooms, offices and meeting rooms and adjacent alumni house for use as a reception center and conference facility.


South Region SPAN K-8 School-LAUSD

Project consisted of several steel-framed buildings for classroom, gymnasium, auditorium and administrative buildings and pre-stressed Concrete Parking Structure.


Park E.S., Marguerita, E.S. and Baldwin E.S. - Alhambra USD

New Building Additions  to three elementary schools.  Type II construction


Luther Burbank Middle School-LAUSD

Gymnasium, Multi-purpose Building and Classroom Building. Located adjacent to seismic faults with surface rupture hazard.


South Region Elementary School No 5-LAUSD

A new school facility consisting of three buildings;  a 28,000-sf two-story classroom and library, two story 41, 800-sf classroom and administrative offices,  and  multipurpose building.


Blair IB Magnet School- Pasadena USD

The Classroom Building is a two story 60,000-sf two-story steel framed building.  The roof and floor plates have a large opening over the central courtyard between the three buildings.


Banning Elementary School-LAUSD

Project consists of a new elementary school facility with a 2-story, wood-framed Type V classroom structure over a Type I  concrete-framed underground parking structure.


Santa Ana School District P2P-Santa Ana USD

Four two-story structural-steel classroom buildings ranging from 30,000-sf to about 50,000-sf.


Oxnard School District P2P- Oxnard USD

Seven Two-story structural-steel classroom buildings from 30,000-sf to 61,000-sf.


Carmen Dragon Elementary School-Antioch, California.

A new Elementary School facility in Northern California.  Project is the first design-build school built in California under Assembly Bill No. 1402.


East Los Angeles Pre-Employment Training Center, LAUSD

Seismic upgrade of 300,000 SF of floor space converted from industrial to classroom use.  Structural systems consisted of tilt-up walls, precast concrete planks and beams and steel-framed roof.


Duarte Junior High School- Duarte USD.

Classroom building , gymnasium, administrative buildings as well as a 500-seat community auditorium.


Chavez Elementary School-Oxnard USD

Two-story structural-steel classroom building, 60,500-sf, designed as a structural steel structure with composite decks. Design for lateral loads included the use of BRB (Buckling Restrained Bracing).  Foundations  are Mat-Type designed to mitigate liquefaction.


Mc Arthur Park Elementary School-LAUSD

Three-story classroom building and multipurpose building over underground parking garage. 


Long Beach Community College-Student Center

Seismic upgrade to current code of 1939 center and addition of new office space.